 Gallery

 Sewerage Treatment Plant 1,
Excavation

  Some examples of previous projects

SewerageTreatment Plant

sewerage treatment plant

Foul water Drain
Drainage Man Hole
Beam Replacement 1,

 Structural Oak Beam replacement

Oak Beam Replacement
Oak Beam Replacement

Swimming Pool Enlargement / Construction 

Swimming Pool excavation
swimming pool Enlargement
Ground works for Wimming pool
Poole Base Hard Core
swimming pool base preperation
 Concrete Pump for Swimming pool base
Swimming pool base extention
swimming pool construction
Pool Steps
swimming pool steps
Swimming pool render
Swimming pool Liner
swimming pool construction
swimming pool
swimming pool
swimming pool 289.JPG
Wet Room Creation
Stud work walls wet room
Wet Room Tiling
Wet room Shower Control

Excavation  for  Rafted  foundation

Crushed Lime Stone for sub  base

Concrete  Rafted  Foundation

Reduced level dig for site preparation of large rafted footing
Mot Type 1 crushed stone  when compacted forms the sub base for the rafted foundation

Concrete poured over D.P.M.

Concrete pour over steel reinforcement to form a rafted foundation

Compacted and Formed Sub Base with Steel  Reinforcement

Concrete  Rafted  Foundation

Compacted and shaped sub base for rafted foundation
Concreted Rafted Foundation
Concrete pour for steel reinforced rafted foundation