naver2ffcb5a3104a2b959d311b30d18ecab1.html
top of page

 Gallery

 Sewerage Treatment Plant 1,
Excavation

  Some examples of previous projects

SewerageTreatment Plant

sewerage treatment plant

Foul water Drain
Drainage Man Hole
Beam Replacement 1,

 Structural Oak Beam replacement

Oak Beam Replacement
Oak Beam Replacement

Swimming Pool Enlargement / Construction 

Swimming Pool excavation
swimming pool Enlargement
Ground works for Wimming pool
Poole Base Hard Core
swimming pool base preperation
 Concrete Pump for Swimming pool base
Swimming pool base extention
swimming pool construction
Pool Steps
swimming pool steps
Swimming pool render
Swimming pool Liner
swimming pool construction
swimming pool
swimming pool
swimming pool 289.JPG
Wet Room Creation
Stud work walls wet room
Wet Room Tiling
Wet room Shower Control

Excavation  for  Rafted  foundation

Crushed Lime Stone for sub  base

Concrete  Rafted  Foundation

IMG-20250716-WA0002_edited.jpg
IMG_20250718_101430_7.jpg

Concrete poured over D.P.M.

Compacted and Formed Sub Base with Steel  Reinforcement

Concrete  Rafted  Foundation

IMG_20250821_115602_6.jpg
Concreted Rafted Foundation
IMG_20250829_114052_0 (1).jpg
bottom of page